Pool house update - March 12, 2015

Great News!  Inspection was passed on the pipe/plumbing changes for the pool house.  The trucks are on site, and will be laying down the floor on Monday morning.  Our original floor was only a 4 inch combination of gravel/concrete, to be up to code our new floor will be 4 inches of gravel and 4 inches of concrete.